Interior design, workplace strategy and turnkey fit-out knowledge from the ICON team.FIELD NOTES · ملاحظات من الموقعPractical knowledge
before you build.
Clear guidance based on real design coordination, approvals and fit-out delivery in Oman.
OFFICE FIT-OUT · 6 MINWhat should be approved before office fit-out starts?
Confirm the space plan, MEP coordination, ceiling interfaces, material schedule and authority requirements before mobilisation. Early coordination protects the programme from costly revisions.
قبل بدء تنفيذ المكتب يجب اعتماد توزيع المساحات وتنسيق الكهرباء والتكييف والحريق والأسقف وجدول المواد، حتى لا تتحول التعديلات المتأخرة إلى تأخير وتكاليف إضافية.
BUDGET PLANNING · 5 MINWhy price per square metre is only a starting point
Project cost changes with the existing site condition, MEP scope, finish level, joinery, approvals and programme. A reliable budget range must consider the complete brief—not area alone.
سعر المتر مؤشر مبدئي فقط؛ فحالة الموقع والأعمال الهندسية ومستوى التشطيب والنجارة والموافقات والمدة تؤثر مباشرة في الميزانية.
RETAIL DELIVERY · 4 MINMall approvals: the documents that keep work moving
Retail projects need coordinated architectural and MEP drawings, material submissions, method statements, test records and inspection requests. A controlled submission log keeps every decision traceable.
مشاريع المولات تحتاج مخططات معمارية وهندسية منسقة واعتمادات مواد وطرق تنفيذ وتقارير فحص. سجل واضح للاعتمادات يحافظ على سير المشروع.